Du Pont Tychem 1000 Level A Hazmat Suit Tk614T fully-encapsulated suit

SKU TA1000 CP Category

R30,969.50 Inc Vat

Pricing Includes VAT

Pricing Excludes Shipping Fees

For bulk orders - please request a quote and email us - [email protected]

Out of stock|Estimate lead time: Request Availability days

The estimate delivery date is just an estimate. If we have your order on hand, your order will be shipped the within 1 to 2 days, when your order is placed. Transit time vary from 1 to 3 days.

Description

For HAZMAT responders, offers a high level of protection against toxic, corrosive gases and liquid chemicals. Size XL

DuPont Tychem® TK model TK614T. Limited-use front entry gas-tight suits with expanded back for SCBA, with stitched and double taped (inside and out) seams,
with vapor tight zipper, hook and loop double zipper flap, attached two piece glove system, adjustable waist belt, integrated socks, with positive pressure exhaust valve and with three ply clear visor. Available in ten nominal sizes and with outer glove options· Butyl (Option code 00) or Viton (Option code 5C). Lime Yellow.

Certifications
Chemical protective clothing, Category III, Type 1a-ET CE Certified according to EN 943-1 + EN 943-2 (Limited-Use gas-tight chemical protective suit for emergencies teams)
See Instruction for Use for further information like Recommended Donning and Doffing Instruction, Glove replacement, Internal pressure test, Storage etc.

 

Full Part Number TK0614TLY00
Fabric / Material Tychem® 10000
Design Gas-tight suit with integral socks and boot flaps
Seam Stitched and double-overtaped

 

Certification and Instructions of use:

IFU_Tychem_TK_614_615

DoC_EN_Tychem_TK_614_615

CE_Tychem_TK_614_615

We stock Jonsson and Dromex workwear and quality footwear brands. If there is items short on your order, that we do not have on hand, the lead times will be as follow:

Dromex items - If not in stock - lead time of 3 to 5 working days. Minimum order quantities will apply on non-stock items.
Pioneer items - if stock is available, 1 to 2 days lead time - Minimum order quantities will apply
Javlin items - lead time 5 to 7 days lead time,
All other brands - Rebel, Wayne, Bova, CAT, LeMaitre, SISI, Frams, Kaliber, PROFIT, Corporate Wear are subjected to availability. Please request availability before you make payment for your order. If the sizes requested are in stock lead time will be 2 to 4 working days, if not in stock, lead time will vary from 7 to 21 days.
Card transaction fees will be deducted from all transactions if we can't supply, if we need to refund, if you did not confirm stock.

**To add reflective tape to a garment - Pricing from R39ex vat per set.**

Email [email protected] for inquiries

**The actual product could differ slightly from the product image. We try to advertise with accurate pictures, but we can't be held accountable if the manufacturer changes their design.**