Javlin Stone Washed Denim Conti Suit

SKU 4022-DE Category

R482.60R632.12 Inc Vat

Pricing Includes VAT

Pricing Excludes Shipping Fees

For bulk orders - please request a quote and email us - [email protected]

Estimated Delivery Date February 19, 2025 - February 25, 2025

The estimate delivery date is just an estimate. If we have your order on hand, your order will be shipped the within 1 to 2 days, when your order is placed. Transit time vary from 1 to 3 days.

Description

Premium Stone Washed Denim Conti Suit
MADE TO SABS SPEC

All seams triple needle stitched ∙ Pockets attached with double needle ∙ Stress points bar-tacked

JACKET
  • Double needle top stitched yoke
  • Lapel collar
  • Left chest pocket with stud flap and pen division
  • Right cellphone pocket with stud flap
  • Concealed YKK metal zip front
  • Lower patch pockets
TROUSERS
  • Elasticated back
  • Riveted metal button closure
  • YKK metal zip fly
  • Seven belt loops
  • Side slant swing pockets
  • Back right patch pocket
  • Double needle front rise

34 – 44 AS QUOTED, 46 + 10%; 48 + 15%; 50 + 20%; 52 + 25%; 54 + 30%; 56 + 35%; 58 + 40%; 60 + 45%; 62 + 50%; 64 + 55%

FABRIC 100% Cotton Denim
WEIGHT 10 oz/yd² ∙ 340 g/m² Heavy Duty

Additional information

SIZES

S – CHEST 32 – WAIST 28, S – CHEST 34 -WAIST 30, M – CHEST 36 – WAIST 32, M – CHEST 38 – WAIST 34, L – CHEST 40 – WAIST 36, L – CHEST 42 – WAIST 38, XL – CHEST 44 – WAIST 40, XL – CHEST 46 – WAIST 42, 2XL – CHEST 48 WAIST 44, 2XL – CHEST 50 – WAIST 46, 3XL – CHEST 52 – WAIST 48, 3XL – CHEST 54 – WAIST 50, 4XL – CHEST 56 – WAIST 52, 4XL – CHEST 58 – WAIST 54, 5XL – CHEST 60 -WAIST 56, 5XL – CHEST 62 – WAIST 58

We stock Dromex workwear and quality footwear brands. If there is items short on your order, that we do not have on hand, the lead times will be as follow

Dromex items - Main stock line, If not in stock - lead time of 3 to 5 working days.
Pioneer items - if stock is available, 1 to 2 days lead time - Minimum order quantities will apply - if out of stock, lead time will vary from 1 to 4 weeks
Javlin Items - if stock is available, 1 to 2 days lead time - if out of stock, lead time will vary from 1 to 4 weeks
Rebel, Wayne, Bova, CAT, LeMaitre, SISI, Frams, Kaliber, PROFIT, Corporate Wear, Hi-Tec, Interceptor, Magnum footwear are subjected to availability. Please request availability before you make payment for your order. If the sizes requested are in stock lead time will be 2 to 4 working days, if not in stock, lead time will vary from 7 to 21 days.
Card transaction fees will be deducted from all transactions if we can't supply, if we need to refund, if you did not confirm stock.

**The actual product could differ slightly from the product image. We try to advertise with accurate pictures, but we can't be held accountable if the manufacturer changes their design.**