Javlin Heavy Duty Denim Conti Jacket

SKU 6281-DE Categories ,

R307.31 Inc Vat

Pricing Includes VAT

Pricing Excludes Shipping Fees

For bulk orders - please request a quote and email us - [email protected]

Estimated Delivery Date March 3, 2025 - March 7, 2025

The estimate delivery date is just an estimate. If we have your order on hand, your order will be shipped the within 1 to 2 days, when your order is placed. Transit time vary from 1 to 3 days.

Description

Heavy Duty Denim Conti Jacket SABS Specification

By: Javlin Workwear


6281-DE

  • Lapel collar
  • Double needle top stitched yoke
  • Left chest pocket with stud flap and pen division
  • Right chest cellphone pocket with stud flap
  • Concealed YKK metal zip front
  • Lower patch pockets
  • All seams triple needle stitched
  • Pockets attached with double needle
  • Stress points bar-tacked

MATERIAL

Heavy Duty Denim Conti Jacket SABS Specification
By: Javlin Workwear
6281-DE

Lapel collar
Double needle top stitched yoke
Left chest pocket with stud flap and pen division
Right chest cellphone pocket with stud flap
Concealed YKK metal zip front
Lower patch pockets
All seams triple needle stitched
Pockets attached with double needle
Stress points bar-tacked
MATERIAL

100% cotton denim 12 oz
FIT

SABS specification
Regular

  • 100% cotton denim 12 oz

FIT

  • SABS specification
  • Regular

Additional information

SIZES

, , , , , , , , , , , , , ,

We stock Dromex workwear and quality footwear brands. If there is items short on your order, that we do not have on hand, the lead times will be as follow

Dromex items - Main stock line, If not in stock - lead time of 3 to 5 working days.
Pioneer items - if stock is available, 1 to 2 days lead time - Minimum order quantities will apply - if out of stock, lead time will vary from 1 to 4 weeks
Javlin Items - if stock is available, 1 to 2 days lead time - if out of stock, lead time will vary from 1 to 4 weeks
Rebel, Wayne, Bova, CAT, LeMaitre, SISI, Frams, Kaliber, PROFIT, Corporate Wear, Hi-Tec, Interceptor, Magnum footwear are subjected to availability. Please request availability before you make payment for your order. If the sizes requested are in stock lead time will be 2 to 4 working days, if not in stock, lead time will vary from 7 to 21 days.
Card transaction fees will be deducted from all transactions if we can't supply, if we need to refund, if you did not confirm stock.

**The actual product could differ slightly from the product image. We try to advertise with accurate pictures, but we can't be held accountable if the manufacturer changes their design.**